American Builders & Contractors Supply Co Inc dba American Construction Metals

Terminated WDID 5S39IN605390 Lodi, San Joaquin County Region 5S · Central Valley (Sacramento)

At a glance

Permit Evidence: SMARTS record
Terminated Industrial
WDID code IN · Permits and applications
Location Evidence: facility-reported
Lodi, San Joaquin County
Region 5S · Central Valley (Sacramento) · Location · Statewide map
Receiving water
Mokelumne River (as reported by the facility)
Evidence: candidate, awaiting review Details
Identified receiving water on the 2026 303(d) list
Not established
Shown only when the reported receiving water is identified and corroborated.
2026 Integrated Report waters within 1.0 km Evidence: geographic proximity
None
Monitoring results Evidence: facility-reported
None in the current exports
Compliance and enforcement records Evidence: SMARTS record
2 inspections · 3 violation records · 0 enforcement actions
Counts as published in SMARTS; not a compliance determination · Details
SMARTS TMDL records Evidence: SMARTS-reported
0 records
TMDL records

Each label shows where a statement comes from. How to read the labels.

Overview and location

Reported facility location HUC12 watershed Corroborated receiving water 2026 Integrated Report waterbodies nearby

Open this facility on the statewide map

Reported location Evidence: facility-reported

Coordinates
38.13471, -121.2503
Precision
4 decimal places
Shared point
2 permits report this exact point
Matches application record
same

Facility location as reported by the discharger in SMARTS; not a discharge point or outfall.

Facility address
1307 E Pine Street, Lodi 95240
Regional Water Board
5S — Central Valley (Sacramento)

HUC12 watershed Evidence: spatial

  • Town of Lodi HUC12 180400121104

The facility's reported location lies within this HUC12 watershed (spatial derivation); it is not a discharge location.

Permits and applications Evidence: SMARTS record

Current permit record

Permit type
Industrial
Application type
WDID code IN
Status
Terminated
Operator
American Builders & Contractors Supply Co Inc dba American Construction Metals
Primary industry (SIC)
3444-Sheet Metal Work
Application ID
507926
NOI processed
Apr 11, 2019
Last certified
Apr 15, 2019
Facility size
246985 SqFt

Retrieved from SMARTS Oct 20, 2026. Verify against SMARTS before relying on it.

Permit history

Storm water applications for this WDID, newest first
ApplicationTypeStatusProcessedTerminatedCertified
507926 IndustrialTerminatedApr 11, 2019 —Apr 15, 2019

Every storm water application SMARTS records for this WDID, newest first (1).

Receiving water

Reported by the facility Evidence: facility-reported
Mokelumne River
Discharges directly / indirectly
Y / N (as answered in the permit application)

Evidence: not confirmed Evidence: candidate, awaiting review Awaiting review

Receiving-water text as reported by the discharger in SMARTS; no waterbody identification has been confirmed.

Why it is not confirmed (1)
  • C1 name is only a prefix of official names

6 official waterbodies share this name; none is assigned without review.

Impaired waters and TMDLs

Two kinds of information, kept apart: 2026 Integrated Report waterbodies near the reported location (geographic proximity only), and TMDL records that SMARTS lists for this facility. Neither establishes where the facility discharges; see Receiving water for the facility's own statement.

Nearby waterbodies Evidence: geographic proximity

Spatial proximity only; discharge pathway not established. Being near a waterbody does not mean the facility discharges to it.

No 2026 Integrated Report waterbody lies within the proximity threshold of the reported location.

SMARTS TMDL records Evidence: SMARTS-reported

No TMDL records for this facility in the SMARTS TMDL export.

Reported monitoring results Evidence: facility-reported

Numeric Action Level (NAL) screening is being independently validated and is not shown. Nothing on this page states whether a result exceeded a NAL.

No industrial monitoring results for this permit are in the current exports.

Compliance and enforcement records Evidence: SMARTS record

These are records as the State Water Board publishes them in SMARTS, with the source's own types and statuses. They are not a compliance determination or rating. A record listed here is not proof of a violation beyond what the source states, and the absence of records does not establish compliance.

Compliance and enforcement records by type
Record typeRecordsAs publishedDatesRetrievedList
Violations3 3 Violation · 0 Potential (preliminary) · 0 Dismissed Apr 12, 2019 – Dec 03, 2020 Oct 21, 2026 All violations
Enforcement actions0 0 issued · 0 draft · 0 withdrawn, rescinded or superseded — Oct 21, 2026
Inspections2inspections, not findings Dec 03, 2020 – May 20, 2021 Oct 21, 2026 All inspections
Annual reports0certified reports (contents not shown) — Oct 21, 2026
Water-quality-based corrective action reports0reports, by parameter — Oct 21, 2026

Each record type is counted by its own SMARTS identifier. A violation and the enforcement action that cites it are two records in two lists; they are never added together.

Chronological record history (5 records, newest first)
Compliance and enforcement records, newest first
DateRecordIDType or purposeStatus as publishedDetail
May 20, 2021 Inspections 2051479 B Type compliance PerformedNo Further Action
Dec 03, 2020 Inspections 2049880 B Type compliance PerformedAdditional Info Required
Dec 03, 2020 Violations 875521 Incomplete/Insufficient SWPPP ViolationInspection
Jul 15, 2020 Violations 873921 Late Report ViolationReport
Apr 12, 2019 Violations 869903 Failure to Obtain Permit ViolationReport

Sources and provenance

Sources behind this page
InformationSourceRetrieved or published
Permit, location, receiving-water textSMARTS Industrial Application Specific DataOct 20, 2026
Permit historySMARTS Storm Water ApplicationsOct 20, 2026
Monitoring resultsSMARTS Industrial Parameter DataOct 20, 2026
Watershed Boundary Dataset HU2 GeoPackages 15, 16, 18 (WBDHU12)USGS2026-10-22
2026 California Integrated Report, Appendix A: 2026 303(d) List (final)SWRCB2026-10-22
Final_2026_Rivers_and_Streams + Final_2026_Lakes_and_Reservoirs (FeatureServer 0)SWRCB GIS2026-10-22
SMARTS TMDL requirementsSMARTS2026-10-21

Relationships computed 2026-10-22 with methods facility_huc12/1, proximity/1, receiving_water/2, tmdl_reference/1, waterbody_huc12_ovl/1, waterbody_huc12_pub/1; proximity threshold 1.0 km.

How to read the evidence labels

Records are shown as published and are not compliance determinations. How geographic context is derived.