Eel River HU, Van Duzen River HA

2026 303(d) list Waterbody ID CAR1112101219990602104416 River & Stream Region 1 · North Coast

At a glance

2026 listing Evidence: State-published
On the 2026 303(d) list · 4 Appendix A decisions
Category 5: a TMDL is required
What a listing means
Pollutants and stressors
4 pollutants in 3 Appendix A categories
Metals (1) · Other Cause (1) · Sediment (2)
Listing decisions
TMDL information Evidence: State-published
4 decisions with a TMDL requirement status; 2 name a TMDL project
Status codes as published: 5A, 5B
TMDL details
Regional Water Board
Region 1 · North Coast
River & Stream · Map
Industrial stormwater facilities
0 report it as their receiving water Evidence: identification corroborated
14 within 1 km Evidence: geographic proximity
Neither count establishes a discharge · Facilities

What a 303(d) listing means

The Clean Water Act section 303(d) list names waters that do not meet water quality standards for one or more pollutants or stressors. California publishes it in the Integrated Report; this page shows the 2026 decisions from Appendix A as published.

2026 listing status Evidence: State-published

On the 2026 303(d) list
Yes
Appendix A decisions
4
Integrated Report category
5 (a TMDL is required)
Listing cycle
2026
State Board adoption
2026-02-03 (Resolution 2026-0005)
USEPA approval
not confirmed — submittal letter to USEPA published; no approval found on the report page (checked 2026-10-22)
Regional Water Board
1 — North Coast

Published by the State Water Resources Control Board (2026 California Integrated Report, Appendix A). Listing status is taken from Appendix A only. A listing describes the condition of this waterbody, not of any facility.

Location

Loading the waterbody shape…

Listing decisions and pollutants Evidence: State-published

Grouped by the Pollutant Category published in Appendix A. Pollutant names, categories and decisions are exactly as published.

Metals (1 decision)

Metals: Appendix A decisions
PollutantPollutant categoryCategoryFinal listing decisionDecision statusSourcesDecision ID
AluminumMetals5 Do Not Delist from 303(d) list (TMDL required list)RevisedA Source Unknown 168433

Other Cause (1 decision)

Other Cause: Appendix A decisions
PollutantPollutant categoryCategoryFinal listing decisionDecision statusSourcesDecision ID
Benthic Community EffectsOther Cause5 List on 303(d) list (TMDL required list)RevisedA Source Unknown 169274

Sediment (2 decisions)

Sediment: Appendix A decisions
PollutantPollutant categoryCategoryFinal listing decisionDecision statusSourcesDecision ID
SedimentSediment5 List on 303(d) list (being addressed by USEPA approved TMDL)RevisedChannel Erosion Construction/Land Development Erosion/Siltation Flow Alteration/Regulation/Modification Habitat Modification Harvesting, Restoration, Residue Management Logging Road Construction/Maintenance Natural Sources Removal of Riparian Vegetation Silvicultural Point Sources Silviculture Streambank Modification/Destabilization 168436
Sedimentation/SiltationSediment5 List on 303(d) list (being addressed by USEPA approved TMDL)OriginalChannel Erosion Construction/Land Development Erosion/Siltation Flow Alteration/Regulation/Modification Habitat Modification Harvesting, Restoration, Residue Management Logging Road Construction/Maintenance Natural Sources Removal of Riparian Vegetation Silvicultural Point Sources Silviculture Streambank Modification/Destabilization 69071

TMDL information Evidence: State-published

TMDL information published for this waterbody
PollutantTMDL requirement statusTMDL projectPriorityUSEPA approval of TMDLExpected attainment
Aluminum5A— Low——
Benthic Community Effects5A— Low——
Sediment5BVan Duzen River Sediment —1999-12-16—
Sedimentation/Siltation5BVan Duzen River Sediment —1999-12-16—

This is TMDL information for the waterbody. It does not establish that a TMDL applies to any particular facility. Facility-specific TMDL requirements recorded in SMARTS appear on facility pages and are not linked to this waterbody until reviewed.

HUC12 watersheds

Published with the listing Evidence: publisher-reported

The published list is truncated in Appendix A; it is not a complete list of watersheds.

Overlapping the waterbody's shape Evidence: spatial

Industrial stormwater facilities

Evidence: identification corroborated

Shows: the facility named this waterbody as its receiving water in SMARTS, and the name and the facility's location are consistent with it. Does not establish: a discharge pathway, a discharge of any pollutant, or a cause of the listing.

Evidence: geographic proximity

Shows: the facility's reported location is within 1 km of the waterbody's mapped shape. Does not establish: that the facility discharges to this waterbody, or any other relationship.

Report this waterbody as their receiving water Evidence: identification corroborated

No facility's reported receiving water is identified as this waterbody.

Within 1 km of a facility's reported location Evidence: geographic proximity

Spatial proximity only; discharge pathway not established. Being near this waterbody does not mean a facility discharges to it.

Facilities whose reported location is within 1 km of this waterbody
FacilityWDIDStatusDistanceMap
Bridgeville Quarry1 12I021038 Terminated30 m map
John N Petersen Inc May Ranch Quarry1 12I012425 Terminated30 m map
Yager Camp1 12I002293 Terminated53 m map
Hely Creek WWDS1 12I024315 Terminated59 m map
Mercer Fraser Co1 53I019043 Active77 m map
Moore Quarry1 12I029555 Active142 m map
Moore Quarry1 12NNA001912 No Action Required142 m map
Degnan Hansen Quarry1 12I029583 Active165 m map
Degnan Hansen Quarry1 12NNA001913 No Action Required165 m map
Bridgeville Quarry1 12I023801 Active254 m map
Yager Camp1 12I022073 Terminated258 m map
Eel River Lumber Products1 12I018618 Terminated458 m map
Eureka Ready Mix Concrete Co1 12I019288 Active687 m map
Cottrell Ranch Quarry1 12I029505 Active792 m map

14 facilities, nearest first.

Sources and provenance

Sources behind this page
InformationSourceRetrieved
Watershed Boundary Dataset HU2 GeoPackages 15, 16, 18 (WBDHU12)USGS2026-10-22
2026 California Integrated Report, Appendix A: 2026 303(d) List (final)SWRCB2026-10-22
Final_2026_Rivers_and_Streams + Final_2026_Lakes_and_Reservoirs (FeatureServer 0)SWRCB GIS2026-10-22
SMARTS TMDL requirementsSMARTS2026-10-21

Relationships computed 2026-10-22 (facility_huc12/1, proximity/1, receiving_water/2, tmdl_reference/1, waterbody_huc12_ovl/1, waterbody_huc12_pub/1).

Integrated Report categories: 5, a TMDL is required; 4a, addressed by a USEPA-approved TMDL; 4b, addressed by other pollution control requirements; 4c, impairment not caused by a pollutant.