Salinas River (middle, near Gonzales Rd crossing to confluence with Nacimiento River)

2026 303(d) list Waterbody ID CAR3091101020020319092611 River & Stream Region 3 · Central Coast

At a glance

2026 listing Evidence: State-published
On the 2026 303(d) list · 5 Appendix A decisions
Category 5: a TMDL is required
What a listing means
Pollutants and stressors
5 pollutants in 3 Appendix A categories
Other Cause (3) · Sediment (1) · Total Toxics (1)
Listing decisions
TMDL information Evidence: State-published
5 decisions with a TMDL requirement status
Status codes as published: 5A
TMDL details
Regional Water Board
Region 3 · Central Coast
River & Stream · Map
Industrial stormwater facilities
0 report it as their receiving water Evidence: identification corroborated
21 within 1 km Evidence: geographic proximity
Neither count establishes a discharge · Facilities

What a 303(d) listing means

The Clean Water Act section 303(d) list names waters that do not meet water quality standards for one or more pollutants or stressors. California publishes it in the Integrated Report; this page shows the 2026 decisions from Appendix A as published.

2026 listing status Evidence: State-published

On the 2026 303(d) list
Yes
Appendix A decisions
5
Integrated Report category
5 (a TMDL is required)
Listing cycle
2026
State Board adoption
2026-02-03 (Resolution 2026-0005)
USEPA approval
not confirmed — submittal letter to USEPA published; no approval found on the report page (checked 2026-10-22)
Regional Water Board
3 — Central Coast

Published by the State Water Resources Control Board (2026 California Integrated Report, Appendix A). Listing status is taken from Appendix A only. A listing describes the condition of this waterbody, not of any facility.

Location

Loading the waterbody shape…

Listing decisions and pollutants Evidence: State-published

Grouped by the Pollutant Category published in Appendix A. Pollutant names, categories and decisions are exactly as published.

Other Cause (3 decisions)

Other Cause: Appendix A decisions
PollutantPollutant categoryCategoryFinal listing decisionDecision statusSourcesDecision ID
Benthic Community EffectsOther Cause5 List on 303(d) list (TMDL required list)RevisedNo Source Analysis Available 131885
pHOther Cause5 Do Not Delist from 303(d) list (TMDL required list)RevisedNo Source Analysis Available 108187
Temperature, waterOther Cause5 Do Not Delist from 303(d) list (TMDL required list)RevisedNo Source Analysis Available 126133

Sediment (1 decision)

Sediment: Appendix A decisions
PollutantPollutant categoryCategoryFinal listing decisionDecision statusSourcesDecision ID
TurbiditySediment5 Do Not Delist from 303(d) list (TMDL required list)RevisedNo Source Analysis Available 108196

Total Toxics (1 decision)

Total Toxics: Appendix A decisions
PollutantPollutant categoryCategoryFinal listing decisionDecision statusSourcesDecision ID
ToxicityTotal Toxics5 Do Not Delist from 303(d) list (TMDL required list)RevisedNo Source Analysis Available 108194

TMDL information Evidence: State-published

TMDL information published for this waterbody
PollutantTMDL requirement statusTMDL projectPriorityUSEPA approval of TMDLExpected attainment
Benthic Community Effects5A— Low——
pH5A— Low——
Temperature, water5A— Low——
Toxicity5A— Low——
Turbidity5A— Low——

This is TMDL information for the waterbody. It does not establish that a TMDL applies to any particular facility. Facility-specific TMDL requirements recorded in SMARTS appear on facility pages and are not linked to this waterbody until reviewed.

HUC12 watersheds

Published with the listing Evidence: publisher-reported

The published list is truncated in Appendix A; it is not a complete list of watersheds.

Overlapping the waterbody's shape Evidence: spatial

Industrial stormwater facilities

Evidence: identification corroborated

Shows: the facility named this waterbody as its receiving water in SMARTS, and the name and the facility's location are consistent with it. Does not establish: a discharge pathway, a discharge of any pollutant, or a cause of the listing.

Evidence: geographic proximity

Shows: the facility's reported location is within 1 km of the waterbody's mapped shape. Does not establish: that the facility discharges to this waterbody, or any other relationship.

Report this waterbody as their receiving water Evidence: identification corroborated

No facility's reported receiving water is identified as this waterbody.

Within 1 km of a facility's reported location Evidence: geographic proximity

Spatial proximity only; discharge pathway not established. Being near this waterbody does not mean a facility discharges to it.

Facilities whose reported location is within 1 km of this waterbody
FacilityWDIDStatusDistanceMap
OHL USA3 27I028288 Terminated2 m map
Monterey Cnty Bradley Transfer3 27I005583 Terminated120 m map
Calportland Construction3 27I017376 Terminated418 m map
Kings Towing Auto Wreckers3 27I027595 Terminated432 m map
Kings Towing3 27IN603729 NOI Required516 m map
Swift Tectonics Inc Chalone3 27I012184 Active520 m map
Sirak S Repair Wrecking Yard3 27I010006 Terminated523 m map
C&C Recycling 23 27NEC006113 Active644 m map
Rancho Los Lobos Landfill3 27I024795 Active658 m map
San Benito Supply3 27I025452 Active704 m map
Soledad Energy LLC3 27I001364 Terminated706 m map
Metz Facility3 27I004653 Terminated761 m map
King City Union High Sch3 27I005339 Terminated804 m map
Echenique Pit3 27I025865 Active825 m map
Paris Valley 2R Rehab Crushing Facilities3 27I028188 Terminated825 m map
Scheid Vineyards3 27NEC001174 Active917 m map
G L Recycling Soledad3 27I024861 Terminated981 m map
G L Recycling Soledad3 27NEC012062 Active981 m map
San Ardo Maintenance Yard3 27I017945 Terminated998 m map
Gazelle Transportation3 27I027902 Terminated999 m map
Gazelle Transportation3 27NEC005366 Terminated999 m map

21 facilities, nearest first.

Sources and provenance

Sources behind this page
InformationSourceRetrieved
Watershed Boundary Dataset HU2 GeoPackages 15, 16, 18 (WBDHU12)USGS2026-10-22
2026 California Integrated Report, Appendix A: 2026 303(d) List (final)SWRCB2026-10-22
Final_2026_Rivers_and_Streams + Final_2026_Lakes_and_Reservoirs (FeatureServer 0)SWRCB GIS2026-10-22
SMARTS TMDL requirementsSMARTS2026-10-21

Relationships computed 2026-10-22 (facility_huc12/1, proximity/1, receiving_water/2, tmdl_reference/1, waterbody_huc12_ovl/1, waterbody_huc12_pub/1).

Integrated Report categories: 5, a TMDL is required; 4a, addressed by a USEPA-approved TMDL; 4b, addressed by other pollution control requirements; 4c, impairment not caused by a pollutant.