Pleasant Grove Creek, South Branch
2026 303(d) list Waterbody ID CAR5192200020070510153551 River & Stream Region 5 · Central Valley
At a glance
- 2026 listing Evidence: State-published
- On the 2026 303(d) list · 7 Appendix A decisions
- Category 5: a TMDL is required
- What a listing means
- Pollutants and stressors
- 7 pollutants in 3 Appendix A categories
- Nutrients (1) · Pesticides (5) · Total Toxics (1)
- Listing decisions
- TMDL information Evidence: State-published
- 7 decisions with a TMDL requirement status; 4 name a TMDL project
- Status codes as published: 5A, 5B
- TMDL details
- Industrial stormwater facilities
- 1 report it as their receiving water Evidence: identification corroborated
- 20 within 1 km Evidence: geographic proximity
- Neither count establishes a discharge · Facilities
What a 303(d) listing means
The Clean Water Act section 303(d) list names waters that do not meet water quality standards for one or more pollutants or stressors. California publishes it in the Integrated Report; this page shows the 2026 decisions from Appendix A as published.
- A listing describes the condition of the waterbody. It does not identify which sources cause the impairment, and it does not by itself place a requirement on any particular facility.
- Listed waters do not all have the same status. The Integrated Report category says how an impairment is being addressed: 5, a TMDL is required; 4a, addressed by a USEPA-approved TMDL; 4b, addressed by other pollution control requirements; 4c, impairment not caused by a pollutant. This waterbody's decisions are in category 5.
- TMDL requirement status values (such as 5A or 5B) are shown exactly as published in Appendix A.
2026 listing status Evidence: State-published
- On the 2026 303(d) list
- Yes
- Appendix A decisions
- 7
- Integrated Report category
- 5 (a TMDL is required)
- Listing cycle
- 2026
- State Board adoption
- 2026-02-03 (Resolution 2026-0005)
- USEPA approval
- not confirmed — submittal letter to USEPA published; no approval found on the report page (checked 2026-10-22)
- Regional Water Board
- 5 — Central Valley
Published by the State Water Resources Control Board (2026 California Integrated Report, Appendix A). Listing status is taken from Appendix A only. A listing describes the condition of this waterbody, not of any facility.
Location
Loading the waterbody shape…
Open this area on the statewide map · Browse impaired waters
Listing decisions and pollutants Evidence: State-published
Grouped by the Pollutant Category published in Appendix A. Pollutant names, categories and decisions are exactly as published.
Nutrients (1 decision)
| Pollutant | Pollutant category | Category | Final listing decision | Decision status | Sources | Decision ID |
|---|---|---|---|---|---|---|
| Oxygen, Dissolved | Nutrients | 5 | Do Not Delist from 303(d) list (TMDL required list) | Revised | A Source Unknown | 146455 |
Pesticides (5 decisions)
| Pollutant | Pollutant category | Category | Final listing decision | Decision status | Sources | Decision ID |
|---|---|---|---|---|---|---|
| Bifenthrin | Pesticides | 5 | Do Not Delist from 303(d) list (being addressed with USEPA approved TMDL) | Revised | A Source Unknown | 170949 |
| Cyfluthrin | Pesticides | 5 | Do Not Delist from 303(d) list (being addressed with USEPA approved TMDL) | Revised | A Source Unknown | 170951 |
| Cypermethrin | Pesticides | 5 | Do Not Delist from 303(d) list (being addressed with USEPA approved TMDL) | Revised | A Source Unknown | 170950 |
| Deltamethrin | Pesticides | 5 | Do Not Delist from 303(d) list (TMDL required list) | Revised | A Source Unknown | 170952 |
| Pyrethroids | Pesticides | 5 | Do Not Delist from 303(d) list (being addressed with USEPA approved TMDL) | Revised | A Source Unknown | 146459 |
Total Toxics (1 decision)
| Pollutant | Pollutant category | Category | Final listing decision | Decision status | Sources | Decision ID |
|---|---|---|---|---|---|---|
| Toxicity | Total Toxics | 5 | Do Not Delist from 303(d) list (TMDL required list) | Original | A Source Unknown | 74080 |
TMDL information Evidence: State-published
| Pollutant | TMDL requirement status | TMDL project | Priority | USEPA approval of TMDL | Expected attainment |
|---|---|---|---|---|---|
| Bifenthrin | 5B | Phase 2 (Pyrethroids)Sacramento and San Joaquin Pesticides Basin Plan Amendment and TMDLs | — | 2019-04-22 | — |
| Cyfluthrin | 5B | Phase 2 (Pyrethroids)Sacramento and San Joaquin Pesticides Basin Plan Amendment and TMDLs | — | 2019-04-22 | — |
| Cypermethrin | 5B | Phase 2 (Pyrethroids)Sacramento and San Joaquin Pesticides Basin Plan Amendment and TMDLs | — | 2019-04-22 | — |
| Deltamethrin | 5A | — | Low | — | — |
| Oxygen, Dissolved | 5A | — | Low | — | — |
| Pyrethroids | 5B | Phase 2 (Pyrethroids)Sacramento and San Joaquin Pesticides Basin Plan Amendment and TMDLs | — | 2019-04-22 | — |
| Toxicity | 5A | — | Low | — | — |
This is TMDL information for the waterbody. It does not establish that a TMDL applies to any particular facility. Facility-specific TMDL requirements recorded in SMARTS appear on facility pages and are not linked to this waterbody until reviewed.
HUC12 watersheds
Published with the listing Evidence: publisher-reported
None published.
Overlapping the waterbody's shape Evidence: spatial
- Pleasant Grove Creek 180201610302
Industrial stormwater facilities
Evidence: identification corroborated
Shows: the facility named this waterbody as its receiving water in SMARTS, and the name and the facility's location are consistent with it. Does not establish: a discharge pathway, a discharge of any pollutant, or a cause of the listing.
Evidence: geographic proximity
Shows: the facility's reported location is within 1 km of the waterbody's mapped shape. Does not establish: that the facility discharges to this waterbody, or any other relationship.
Report this waterbody as their receiving water Evidence: identification corroborated
| Facility | WDID | Status | Distance from reported location | Map |
|---|---|---|---|---|
| Amazon com Services LLC PKG Roseville3 | 5S31I030354 | Active | 1.2 km | map |
Receiving water reported by facility — waterbody identification corroborated by geographic evidence. 1 facility.
Within 1 km of a facility's reported location Evidence: geographic proximity
Spatial proximity only; discharge pathway not established. Being near this waterbody does not mean a facility discharges to it.
| Facility | WDID | Status | Distance | Map |
|---|---|---|---|---|
| Renesas Electronics America Inc | 5S31I001326 | Terminated | 345 m | map |
| Renesas Electronics America Inc | 5S31I001834 | Terminated | 345 m | map |
| Dena Transport Incorporated | 5S31NNA002115 | NONA Submitted | 481 m | map |
| American River Transport | 5S31NNA001066 | NONA Submitted | 486 m | map |
| Major H Services LLC | 5S31NNA001905 | NONA Submitted | 546 m | map |
| FedEx Terminal | 5S31NEC008475 | Terminated | 552 m | map |
| Ericcson Trucking & Company | 5S31NNA000762 | NONA Submitted | 553 m | map |
| You Call We Haul Transportation LLC | 5S31NNA001855 | NONA Submitted | 558 m | map |
| Shane Hauls LLC | 5S31NNA002376 | NONA Submitted | 730 m | map |
| KANNOPI LOGISTICS LLC | 5S31NNA000763 | NONA Submitted | 754 m | map |
| TSI Semiconductors America LLC | 5S31I023169 | Terminated | 835 m | map |
| Robert Bosch Semiconductor LLC | 5S31I030386 | Active | 835 m | map |
| Security Public Storage Roseville II | 5S31NEC006196 | Terminated | 848 m | map |
| Security Public Storage Roseville II | 5S31NNA000924 | NONA Submitted | 848 m | map |
| Petersen Precision Roseville | 5S31NEC009716 | Active | 885 m | map |
| TLC Dash | 5S31NNA001658 | NONA Submitted | 902 m | map |
| Penumbra Roseville | 5S31NEC008796 | Active | 905 m | map |
| Roseville - Junction Blvd | 5S31NNA001504 | NONA Submitted | 921 m | map |
| Amazon com Services LLC DSR2 | 5S31I028833 | Active | 935 m | map |
| Pots of Joie | 5S31NEC011931 | Terminated | 963 m | map |
20 facilities, nearest first.
Sources and provenance
| Information | Source | Retrieved |
|---|---|---|
| Watershed Boundary Dataset HU2 GeoPackages 15, 16, 18 (WBDHU12) | USGS | 2026-10-22 |
| 2026 California Integrated Report, Appendix A: 2026 303(d) List (final) | SWRCB | 2026-10-22 |
| Final_2026_Rivers_and_Streams + Final_2026_Lakes_and_Reservoirs (FeatureServer 0) | SWRCB GIS | 2026-10-22 |
| SMARTS TMDL requirements | SMARTS | 2026-10-21 |
Relationships computed 2026-10-22 (facility_huc12/1, proximity/1, receiving_water/2, tmdl_reference/1, waterbody_huc12_ovl/1, waterbody_huc12_pub/1).
Integrated Report categories: 5, a TMDL is required; 4a, addressed by a USEPA-approved TMDL; 4b, addressed by other pollution control requirements; 4c, impairment not caused by a pollutant.