Waterbody profile
Official Water Board record · 2026 cycleEach row is one official listing decision from Appendix A of the Final 2026 California Integrated Report. Source terminology is preserved as published.
| Pollutant / stressor | Decision ID | Final listing decision | Decision status | TMDL requirement status | TMDL project | TMDL priority |
|---|---|---|---|---|---|---|
| ArsenicMetals | 84426 | List on 303(d) list (TMDL required list) | Original | 5A — TMDL still required | — | Low |
| CopperMetals | 87135 | List on 303(d) list (TMDL required list) | Original | 5A — TMDL still required | — | Low |
| DieldrinPesticides | 84605 | List on 303(d) list (TMDL required list) | Original | 5A — TMDL still required | — | Low |
| Oxygen, DissolvedNutrients | 85633 | List on 303(d) list (TMDL required list) | Original | 5A — TMDL still required | — | Low |
| PCBs (Polychlorinated biphenyls)Toxic Organics | 84749 | List on 303(d) list (TMDL required list) | Original | 5A — TMDL still required | — | Low |
Official 2026 Water Board geometry. Demonstration facility markers are shown for context only.
Geographically associated industrial stormwater facilities whose reported results exceeded an Industrial General Permit Numeric Action Level for a pollutant this waterbody is listed for.
Santa Cruz Harbor Boatyard3 44I024788
Copper · most recent exceedance RY 2025 · association: derived receiving water
Santa Cruz Port District Maintenance Facility and Dredge Yard3 44I003481
Copper · most recent exceedance RY 2025 · association: derived receiving water
This is derived co-occurrence between a calculated NAL comparison and the official 303(d) listing for this waterbody. An NAL exceedance triggers Exceedance Response Actions under the permit; it is not a violation and does not establish that any facility caused or contributed to this impairment.
Industrial stormwater facilities geographically associated with this waterbody. These are derived spatial associations, not Water Board findings.
Santa Cruz · Notice of Intent · 0.06 km away
Derived by California Stormwater Intelligence
Santa Cruz · Notice of Intent · 0.09 km away
Derived by California Stormwater Intelligence
Facility records are official Industrial General Permit registrations, but the association between a facility and this waterbody is derived geographically (proximity or shared HUC12 subwatershed) and is not a Water Board receiving-water determination. Where a permit carries a Water Board-stated TMDL requirement naming this water, it is listed separately above.